Litomyšl
Wastewater Treatment Plant Prague
About the Project
- Investor: Prague Water Management Company a.s.
- Pilot project to verify the future use of biogas
- Treatment of excess sludge biogas that cannot be processed in the existing cogeneration units
- Extraction pipeline designed for all future biomethane production (total length of approximately 300 meters)
- Connection of Papírenská Street to the terminal part of the low-pressure gas pipeline with a pressure of 0.8-1.1 bar
Scope of Technology Supply from HUTIRA:
- Biomethane measurement and analysis unit
- Analyzers for measuring H2S, O2, and dew point
- Emerson Rosemount 370 XA chromatograph
- Regulation for the low-pressure gas pipeline
- Container solution
- Commercial measurement
- Carburization/propane unit
- Connections between technologies
- Shaft – ground module on Papírenská Street
11/2021
Participation as a Subcontractor
5/2022
Signing of the Contract
6/2022 - 2/2023
Production in the Workshop
3/2023
Delivery to the Site
5-6-/2023
Installation and Commissioning