About the Project

  • Innovation of the Biogas Plant of the Agricultural Cooperative of Breeders and Growers in Litomyšl.
  • „BGP, which currently uses biogas for cogeneration of heat and power (CHP).
  • The project addresses the upgrading of biogas to the quality of natural gas, specifically biomethane, and its injection into the high-pressure gas pipeline system for use at a CNG refueling station.
Biogas Plant ZDCHP Litomyšl | HUTIRA green gas

Scope of Technology Supply:

  • Raw biogas pretreatment unit with a capacity of up to 550 Nm³/hour
  • Upgrading unit with membrane separation for the conversion of biogas to biomethane
  • Injection unit – measurement of the volume and quality of biomethane and pressure compression for delivery to the high-pressure gas pipeline with a pressure of 2.3 – 2.5 MPa
  • Odorization station
  • Extraction pipeline – Construction of the extraction pipeline
  • CNG station
Biogas Plant ZDCHP Litomyšl | HUTIRA green gas

Technical Parameters of the Technology in Litomyšl:

  • The upgrading project of biogas builds upon the existing BGP facility, where biogas is used for cogeneration of heat and power.
  • The modification of a portion of the produced biogas to the quality of natural gas (upgrading).
  • Injection of biomethane into the high-pressure gas pipeline system (Gas2Grid).
Biogas Plant ZDCHP Litomyšl | HUTIRA green gas

Building Permit

2020

Selection of the Supplier

9/2021

Implementation of the Project

5-8/2022

Commencement of Testing Operations

9/2022

Final Inspection

11/2022

Project Completion

12/2022