info@hutiragreen.cz / SK greengas@hutiraslovakia.sk
+420 541 212 144 / SK +421 915 867 093
Menu

About the Project

  • Investor: Prague Water Management Company a.s.
  • Pilot project to verify the future use of biogas
  • Treatment of excess sludge biogas that cannot be processed in the existing cogeneration units
  • Extraction pipeline designed for all future biomethane production (total length of approximately 300 meters)
  • Connection of Papírenská Street to the terminal part of the low-pressure gas pipeline with a pressure of 0.8-1.1 bar
Wastewater Treatment Plant Prague | HUTIRA green gas

Scope of Technology Supply from HUTIRA:

  • Biomethane measurement and analysis unit
    • Analyzers for measuring H2S, O2, and dew point
    • Emerson Rosemount 370 XA chromatograph
    • Regulation for the low-pressure gas pipeline
    • Container solution
    • Commercial measurement
  • Carburization/propane unit
  • Connections between technologies
  • Shaft – ground module on Papírenská Street
Wastewater Treatment Plant Prague | HUTIRA green gas

11/2021

Participation as a Subcontractor

5/2022

Signing of the Contract

6/2022 - 2/2023

Production in the Workshop

3/2023

Delivery to the Site

5-6-/2023

Installation and Commissioning