About the project

  • Capacity 500 Nm /h of biomethane
  • Upgrade of technology and increase of the capacity of biomethane stations
  • Waste biogas plant
  • The order was specific in that it was not a standard container solution that we normally supply, but was the installation of a unit into an existing building
Modernisation of the biogas plant in Rapotín | HUTIRA green gas

Delivery of HUTIRA technology

  • HUTIRA G rid Injection Unit – Technology for measuring the volume and quality of biomethane
  • Compressor station
  • Propanisation including propane tank
  • Odorization station

The HP injection unit was designed for the following technical parameters:

  • Inlet pressure: 7-14 bar(g)
  • Outlet pressure: 17-25 bar(g) (depending on the pressure in the distribution network)
  • Flow rate: up to 500 Nm3/h
Modernisation of the biogas plant in Rapotín | HUTIRA green gas