Complete delivery of the “container gas regulation station” to Ghana
The implementation of a container regulation station on the African continent was a complicated project. However, thanks to accurate planning and the professional approach of our employees, the entire implementation was a great success. As a result, we managed to establish our brand in such a remote and competitive environment as Africa.
Client
Gas power plant in Tema, Ghana
Date of realization
2013
Industry sector
Gas
Technical parameters
Qmax = 25 000 m3(N)/hr
Inlet pressure: 30 – 35 bar
Outlet pressure: 350 – 400 mbar
The container solution is a suitable alternative to regulation stations in permanent buildings. They are best suited for locations where funding is somehow limited. The technology can contain the following sections: filtering, measuring, regulation and evaluation (natural gas parameters, chromatograph, and complete visualization). As far as the container itself is concerned, it serves for transport and as a building object. Only connection and final commissioning are carried out at the installation site. We also offer container solutions for biogas-biomethane conversion technology.